Just How to Specify Helical Tieback Anchors in Commercial Style Documentations
Helical tieback anchors usually tend to become the quiet workhorses of industrial foundation devices. They hold basement wall surfaces against lateral earth pressure, prepare cut wall structures during the course of deep diggings, as well as stabilize waterfront retaining walls where gain access to is actually precarious and also vibration has to be actually restricted. The idea is actually straightforward, yet getting the standard right is certainly not. A strong specification protects the layout intent, provides contractors very clear aim ats, as well as leaves room for industry opinion when soils perform certainly not review the memorandum. What adheres to mirrors the details our company often tend to settle on real jobs: the components that go wrong, the conditions that save time and money, helical pier techniques https://www.unitedstructuralsystems.com/basement-and-crawlspace-waterproofing/ and the submittal items that in fact matter.
Where tieback anchors suit the office toolbox
On business jobs, you are going to find helical tiebacks together with helical piles, resistance piles, and also micropiles. Helical piles as well as protection heaps lug vertical building loads right into competent strata. Micropiles manage hefty central requirements where cost is tight or even where debris-riddled loads help make large arrows unwise. Helical tiebacks, through comparison, avoid sidewise loads. They are actually frequently used in concert with birth control walls, sheet stacks, soldier stack and also lagging, as well as cast-in-place concrete basement walls. It is common for the very same specialty professional to provide both commercial helical pile installation for gravitation lots and commercial helical tieback anchor installation for lateral restriction, which simplifies balance and also testing.
If a venture consists of deep foundation repair or commercial foundation stabilization, tiebacks may reinforce an older wall while helical piles or micropiles take vertical tons from new framework. On flood-prone or beachfront internet sites, tiebacks assist maintain quality separations where additional charge as well as hydrostatic disorders differ seasonally. As well as in metropolitan excavations along with rigorous resonance restrictions, helical anchors deliver functioning capacity without the sound and also ground disorder of taught tieback anchors.
The efficiency intent that ought to lead the spec
A helical tieback anchor is a steel shaft along with several helical platters that is turned in to the dirt to create axial capacity in pressure. The efficiency is actually governed by:
Helix geometry as well as space, which regulates personal bearing and also group interaction. Embedment deepness and also incline, which sets the duration of withstanding ground and also the geometry of the wall surface connection. Soil shear durability as well as device weight, which inform connect capability and also creep behavior. Corrosion protection as well as longevity regulations, which determine life span under expected chemistry. Proof and performance testing, which confirm the concept model and also squeeze installation quality.
Start your specification coming from 1st guidelines: Just how much side bunch must the anchor avoid? What activity can the sustained wall tolerate? The length of time must the body final? Coming from certainly there, port in the particulars. Carry out not merely paste a seller sheet.
Coordinate early: geotechnical, building, as well as indicates as well as methods
The spec must demonstrate geotechnical suggestions, building needs, as well as practical setup restrictions. The geotechnical document must deliver undrained shear toughness or rubbing slants as well as system weights through intensity, groundwater degrees, constraints on vibration, and any type of corrosivity data. If the file is noiseless on rust, emphasize general testing for pH, resistivity, chlorides, and sulfates at the midsts of the helical plates. If the project is actually a fast-track foundation crack repair and also time is actually tight, at the very least call the geotechnical designer to integrate expectations on shear toughness and creep.
On the architectural side, determine the wall's concept the planet tensions, surcharge coming from surrounding real-time loads or website traffic, and hydrostatic differents if basement waterproofing adjustments drain. Decide on a tieback disposition and a link type that match the wall surface geometry as well as rebar layout. For soldier heap as well as lagging, the connection is actually commonly a waler layer with a hollow-core or sound pub and almond. For cast-in-place wall surfaces, a blockout with a bearing layer and also hairpins streamlines the connection, but inspect cover and also waterproofing information. Commercial foundation repair frequently involves unpleasant geometry, thus mockups or outlet details aid catch contravene rebar or even embedded conduits.
Finally, do not dismiss site means and approaches. Interior tiebacks in existing designs require overhead open space for the drive scalp and ample twist reaction. Helical anchors shine where gain access to is precarious, yet even tiny rigs require working room. If the digging is actually braced and you need tiebacks as short-term support, the specification must permit reaction structures or soldered brackets to grasp the wall structure carefully during the course of exploration. On waterfront bulkheads or even crowded energy hallways, noise and also vibration restrictions most likely dismiss steered devices like protection stacks. Helical anchors accommodate these restrictions well, as well as they get married to cleanly along with commercial helical pile installation for bundled vertical and also side systems.
Selecting a helical tieback system: shaft, coil, as well as corrosion
Most commercial helical tiebacks make use of either a strong square bar pole or even a whole vacant stem. Square bar cylinders are actually efficient in pressure, transfer torque properly, and satisfy coarse-grained loads and clays with moderate blockages. Round bars are actually stiffer and also stand up to bending in dirts with gaps or blended fills, but the larger dimension needs extra twist. For urban excavations with rubble or even cinder stuffing, I tend to point out rounded shaft for the 1st 8 to 12 feets to unite debris, at that point change if needed. For basement walls in even clay, straight pub is actually frequently ample and also economical.
Helix arrangement matters. As a rule of finger, helix layers should be actually spaced at the very least 3 times the biggest coil diameter apart and also put up to ensure that just one helix remains in a given soil horizon mediocre. Action helix sizes down with depth to keep approximately even tension amounts. For instance, a 10-12-14 in stack could be overkill in loose sand with groundwater, yet a 10-12 inch set at a steeper inclination could thread in to a denser coating at 25 to 30 feets <strong><em>helical pile foundations</em></strong> http://query.nytimes.com/search/sitesearch/?action=click&contentCollection®ion=TopBar&WT.nav=searchWidget&module=SearchSubmit&pgtype=Homepage#/helical pile foundations and provide reputable capacity along with a lot less twist escalation.
Corrosion security may be propitiatory steel, priming, or a mix. For a 50-year style everyday life in mildly destructive soil, added sacrificial fullness on bum rap as well as platters commonly is enough. Where chlorides or roaming present are actually reputable risks, indicate hot-dip galvanizing to ASTM A123 on layers and A153 on hardware, as well as include a calculated propitiatory reduction based on determined ground resistivity. In aggressive sites, like close to industrial outfalls, look at grout encapsulation over vital spans or duplex security. Stay away from obscure expressions like "sufficient corrosion security." Write what is actually called for, how it will certainly be measured, and also what options the professional may propose.
Capacity models as well as installation torque
Helical support layout typically connects the predicted best ability to the total of private helix bearing capabilities, readjusted for interaction, or even to setup twist making use of an observational twist connection. Each methods may be legitimate. I choose to specify the concept style and additionally call for a twist criterion as an industry check. The twist procedure relates supreme capacity to last installation twist T along with a variable KT, usually in the series of 8 to 14 for square bar as well as somewhat reduced for much larger sphere bars. KT is actually not common. It relies on shaft kind, helix size, as well as producer screening. Need the professional to explain the KT they mean to make use of, give test information certain to bum rap and helix configuration, and then confirm it along with on-site verification tests.
Define variables of safety and security. For long-lasting supports avoiding sustained weights, a minimal factor of protection of 2.0 on ultimate ability is common. Where sneak command is vital, indicate approval based on action under a one-hour hold at 1.33 opportunities the layout service load, using a variation limit appropriate to the wall structure unit. For short-term supports, the factor may be lower if validated by testing and monitoring, however carry out certainly not stint creep sign in smooth clays.
Inclination, connection duration, and also wall surface geometry
Helical tiebacks are usually installed at angle of inclinations between 10 and 30 levels below parallel. Flatter angles lengthen the connect region and reduce upright lots parts in the wall, but they require even more right of way responsible for the wall structure. Steeper slants can easily help steer clear of powers as well as property lines but focus helix plates more detailed to the wall structure. Intention to position the initial coil a minimum of 6 helix diameters past the active block or free throw line of prospective failing. In slice pitches along with split soils, press the coil pile to an intensity where the lowest helix lives in experienced material with reduced expected creep. Do not rely on static protection near a fresh slice to hold the day.
At the wall surface, detail a hookup that you can construct. A welded or even run off platter along with a spheric washer and also almond provides resistance for small misalignment. In cast-in-place wall structures, feature a recess to fit the nut as well as plate thus water-proofing can bridge over precisely. If the venture includes foundation crack repair, make certain the support head as well as platter carry out certainly not land on damaged concrete. If improving threads or heavy congestion exist, a pre-sleeved blockout may stop blowouts during installation.
Testing that verifies the body works
Field testing is where the requirements either spares opportunity or even makes arguments. Demand submittals for exam procedures that adhere to a recognized requirement, such as ASTM D3689 for tension load examinations adjusted to helical anchors, and also clearly describe three examination categories.
Preproduction load examinations on sacrificial supports. These figure out the load-displacement action in depictive grounds and verify the KT connection in between torque as well as capability. Need at least pair of preproduction tests for every specific dirt zone or even anchor type. Proof examinations on development anchors, typically 5 to 10 per-cent of the total amount. Lots to 1.5 times the layout solution lots with hold time frames as well as motion requirements that capture creep. Performance exams when the internet site geography differs significantly or when layout bunches are uncommonly higher. These test to higher multiples of company lots and feature staged hold time periods to determine time-dependent movement.
Require digital twist records videotaped at least every feet, along with downhole desire readings if readily available. The most effective specialty service providers right now match twist records along with family doctor deepness and operator notes that determine changes in gear velocity and also crowd stress. When a helical tieback delays at 18 feet and after that records a measure rise in twist at 22 feets, that tells you a sand lense yielded to thick till, and also adjustment should seem in both the torque log as well as the activity contour during the course of testing.
Allowable movements and also creep criteria
Anchor approval rests on displacement as much as load. For long-lasting tiebacks assisting cellar walls, I generally confine activity during evidence exams to no greater than 0.04 inches in between the 1- and 10-minute readings at 1.33 times company tons, along with overall activity under the final test bunch lower than 0.5 inches. In smooth clay-baseds or even extremely all natural soils, creep may dominate capability. The specification ought to provide the engineer authorization to call for longer hold durations if the one-minute to ten-minute pitch continues to be above target.
If the wall system feels, for instance glass drape walls seated on a grade-beam tied into a basement wall, lower movement restrictions are actually warranted. For short-term excavation assistance, especially for soldier pile and also lagging where motions can be larger without architectural repercussions, the limits may be a lot more flexible. In either case, put numbers in the specification and endorsement the exact same amounts in the recognition paragraph so there is no ambiguity.
Detailing the delegations that matter
A really good helical tieback anchor delegation has greater than a shiny sales brochure. Ask for:
An enclosed design rundown along with the needed company and also best bunches, inclination, connect length, helix setup, and also corrosion defense beliefs, authorized through a professional developer certified in the venture state.
Manufacturer information pieces specific to bum rap and also coils, including permitted twist, flexible ability, weld treatments, and relationship equipment capacities.
Installation plan identifying gear style, accessibility routes, torque surveillance devices, calibration files, and also techniques for twist reaction versus the wall or even momentary frames.
Test plannings that cite the basic complied with, loading timetable, hold times, recognition standards, and also information documenting methods.
Corrosion assessment with dirt chemical make up records, picked security approach, and worked out sacrificial allocations or finish thicknesses.
Keep the submittal to-do list strict. The even more focused the demand, the very likely you acquire valuable material as opposed to boilerplate. If the project additionally consists of commercial resistance pile installation or even micropile installation for upright loads, fit in with the testing as well as corrosion areas all over units to avoid conflicting requirements.
Writing crystal clear recognition criteria
Build recognition into the specification in two layers: development confirmation through twist and also verification testing results. A traditional collection of stipulations could mention that each production support should attain a minimum installment torque connected to an utmost capacity of a minimum of two opportunities the concept solution load, along with the KT worth derived from preproduction examinations. Then, for the supports decided on for proof screening, provide displacement limitations at defined hold times and need a tidy rebound contour upon unloading.
Include an acceleration course. If a support fails to connect with torque due to blockage or unstable soil, permit relocation within a described area or enable expansion along with added helix layers, provided lowest spaces as well as geometry are maintained. If evidence screening fails as a result of excessive creep, need a redesign of the coil setup or even much deeper embedment and also retesting. This steers clear of disputes in the business as shapes evolve.
Dealing with blockages as well as variable soils
Commercial web sites rarely give textbook soils. Debris fills up, aged bases, riveted electricals, and pockets of peat moss can all show up. Your spec must anticipate these realities. Permit predrilling through superficial obstacles where necessary, however specified restrictions thus predrilling does certainly not take out the really soils the helix layers demand to engage. A typical practice is to permit predrilling approximately the lead area idea, with a size absolutely no higher than bum rap dimension, and also to ban predrilling at helix altitudes. For much larger obstructions like deserted grounds, permit center boring along with records of site and also dimension, at that point need the support to expand past the impediment through a minimal deepness before tallying capacity.
In sands beneath the water level, installation twist can underpredict capacity if pore stress fritter away gradually. In very soft clays, twist can easily overpredict capacity since disorder lowers temporary strength. The solution is not to abandon torque yet to adjust it along with preproduction examinations. State this in the specification as well as insist on site-specific KT.
Connection components and also lots transfer
The support is merely just as good as its scalp. For cast-in-place concrete, a bonded plate along with a sleeve and nut is common, yet look for embedment edge ranges as well as rebar problems. For steel walers on soldier pile walls, information a plate along with slotted openings to steer positioning adjustments without field flame-cutting. When stainless steel or even galvanic separation is demanded due to oxidation issues near beachfront structures, point out segregating washing machines and appropriate finishes. Where basement waterproofing is vital, correlative with the pouch professional. Infiltrations through membranes need to have footwear or even hyperlink tapes rated for action at the load head, as well as those details must reside in the home collection with crystal clear references to the architectural sheets.
If the project also consists of commercial helical pile installation or micropiles, straighten the head information so that potential maintenance and also evaluation carry out not demand specialty resources for one unit and also certainly not the other. Congruity conserves time.
Construction resistances as well as documentation
Write resistances that your inspector can easily gauge. For inclination, an endurance of plus or even minus 2 degrees is actually realistic with contemporary gears and inclinometers. For place at the wall structure skin, 1 in is manageable, offered the wall structure format is actually correct. For intensity, indicate a minimal deepness to the first coil past the possible failure block, certainly not a max duration. Feature a need that the contractor send as-built logs with the ultimate twist profile page, obtained midsts, desire measurements, and also the serial numbers of the anchors if the maker tracks them.
The best teams always keep well-maintained, straightforward logs. On one midtown retrofit that combined structural foundation repair along with brand-new helical tiebacks, the superintendent videotaped a laminated chart at the gear: target twist through depth in 5-foot increments based on the preproduction tests. Every operator knew the targets for each and every area. The as-builts matched the chart within 10 percent, as well as proof examinations were actually boring. That is not good fortune; it is actually clarity.
Integration with various other deep groundwork systems
Tiebacks hardly online alone. Commercial foundation repair commonly mixes helical anchors for lateral tons along with resistance heaps or even helical piles for settlement deal management. If your job consists of commercial resistance pile installation, make sure the tieback design steers clear of load paths that may minimize the sidewise preparing impact of stacks. For example, perform not place tiebacks so close to pile groups that their stress and anxiety light bulbs overlap at the very same elevation in such a way that threatens either body's performance. Along with micropiles, expect inspecting obstruction and also define minimum splittings up or installment series that stay clear of crowding.
When foundation crack repair on an existing wall structure belongs to the range, choose whether tiebacks are going to briefly discharge the wall structure while epoxy injection or even carbon thread encouragement cures. If thus, consist of tons transfer keep in minds in the sequencing segment and correlative assessment points in between structural and also specialty inspectors.
Sequencing, security, and top quality control
Helical tieback setup is quiet and simple contrasted to pierced supports, yet it still brings risks. Response structures can establish high focused bunches on partially treated concrete. Gear rescinding hazards climb on sloped diggings. The spec should demand a site-specific safety and security planning that addresses torque responses, operating systems, and also above risks. In occupied structures, specified hours and also resonance thresholds.
Quality command begins along with equipment gradation. Need torque cell calibration certificates within 6 months and confirm regular absolutely no checks on bunch cells. Required that a qualified manager exist during the course of the initial installation of each switch as well as for all evidence examinations. If climate swings are actually harsh, call for a pause when temperature levels fall below a threshold that impacts cement or even layer healing, specifically if any type of grouted encapsulations or bound heads are actually used.
Writing the spec foreign language along with clearness as well as flexibility
Crisp language assists. Avoid expressions like "as demanded for a full system." Rather, state the performance aim at and the satisfactory techniques to present conformity. Always keep exclusive referrals out unless you possess a basis-of-design product called with an "or equal" clause that in fact permits amounts to. If the project staff assumes a certain helical anchor maker as a result of previous performance, be clear, however shield the proprietor's utilize through allowing alternates that meet the same testing past and ability documentation.
Leave area for area selections that carry out certainly not jeopardize performance. Permit the specialty specialist to change coil spacing within an indicated selection to eliminate obstacles or twist oddities, supplied minimum separation is kept and the last arrangement is actually chronicled. Allow slight changes in incline to steer clear of utilities, but limit the upright load element introduced by steeper angles and demand a change in head layer ability if needed.
An example outline you can easily adapt
The backbone of a great requirements usually tends to adhere to the same motifs, although each venture is distinct. When I make, I always keep a short list taped to my monitor.
Performance requirements: solution tons, elements of safety and security, motion restrictions, as well as style life with oxidation assumptions. Materials as well as setup: ray style, coil dimensions as well as space, connection particulars, and coatings. Submittals and commendations: layout calculations, information pieces, setup as well as screening strategies, and also corrosion evaluation. Installation as well as screening: twist surveillance, examination types and also acceptance requirements, endurances, as well as documentation. Adjustments as well as emergencies: dealing with blockages, relocation rules, extension or redesign triggers, and also growth roads for stopped working tests.
That rundown is actually certainly not a substitute for thought, however it stops omission of the things that most often wreck schedules.
Costs, timetable, and also what proprietors care about
Owners appreciate routine of a routine as well as shortage of shocks much more than a couple of portion points of product cost. Helical anchors are actually swiftly. On a straightforward cellar wall, a two-person team with a mid-size gear may put up 8 to 15 anchors per day, depending on deepness and accessibility. Testing includes opportunity, as well as you need to plan for a minimum of one full day for preproduction tests and one to 2 days for evidence testing on a common fifty to 80 anchor task. Very clear acceptance criteria steer clear of retesting because of interpretation disputes.
As for cost, square bar supports with priming and standard heads are actually usually a lot more affordable per foot than round shaft bodies, yet the soil directs what works. If you try to spare cash by forcing a square pub by means of rubble, you will certainly spend it back in wasted time as well as damaged leads. If budget pressure is actually hefty, try to maximize helix count and dimensions based upon the exam information as opposed to pinching rust allotments or screening regularity. Proprietors can take a small fee if it gets self-confidence. They perform dislike change purchases when supports stall short of torque.
When not to use helical tiebacks
They are actually certainly not a relief. If the internet site has large stones or even cobbles, installment can become impractically slow-moving or even difficult. In very dense frosty tills with gravel lenses, torque can spike beyond bum rap and also combining restrictions prior to the helices get to layout depth. If significant blockages are assumed all over the entire elevation band, pierced ground anchors might be better suited. In really gentle, very organic soils along with a long creep rear, helical anchors may accomplish torque without trusted long-term movement command. Micropiles battered in strain or deadman bodies could offer far better. The specification should equip the geotechnical engineer to contact this pivot based on preproduction results.
Bringing all of it together
A thoughtful standard for helical tieback anchors harmonies clearness along with adaptability. It establishes measurable targets for capability and motion, describes components and rust protection in defensible terms, as well as calls for screening that proves the system under site states. It prepares for obstructions and variation without inviting open-ended modification orders. And also it incorporates easily with similar units like helical piles, resistance heaps, and micropiles that commonly share the very same wall structure pipe. Write what you need, enable what you can, as well as confirm what concerns. Carry out that, and your commercial helical tieback anchor installation will definitely sustain the project silently as well as reliably, which is actually specifically what a good anchor needs to do.
<h1>UNITED STRUCTURAL SYSTEMS OF ILLINOIS, INC</h1>
2124 Stonington Ave
Hoffman Estates, IL 60169
847-382-2882
rick@ussofil.com>
Mon-Fri 8:30am-5:00pm
Sat-Sun By Appointment
<hr>
<div style="display:flex;flex-wrap:wrap;gap:8px;justify-content:center;"><img src="https://sharebuttons.ai/platforms/chatgpt-logo.png" width="16" height="16" style="margin-right:6px;" alt="ChatGPT">Ask ChatGPT https://chat.openai.com/?q=Provide%2520a%2520comprehensive%2520summary%2520of%2520this%2520Product%2520Page%2520from%2520Commercial%2520Helical%2520Pile%2520Installation%2520at%2520https%253A%252F%252Fhttps%253A%252F%252Fwww.unitedstructuralsystems.com%252Fcommercial-helical-pile-installation%252Fwww.redsinloomis.com%252Fholiday-dining-loomis.%2520Highlight%2520the%2520main%2520points%252C%2520key%2520insights%252C%2520and%2520conclusions%2520in%2520an%2520accessible%2520way.%2520I<img src="https://sharebuttons.ai/platforms/grok-logo.png" width="16" height="16" style="margin-right:6px;" alt="Grok">Ask Grok https://x.com/i/grok?text=Provide%2520a%2520comprehensive%2520summary%2520of%2520this%2520Product%2520Page%2520from%2520Commercial%2520Helical%2520Pile%2520Installation%2520at%2520https%253A%252F%252Fhttps%253A%252F%252Fwww.unitedstructuralsystems.com%252Fcommercial-helical-pile-installation%252Fwww.redsinloomis.com%252Fholiday-dining-loomis.%2520Highlight%2520the%2520main%2520points%252C%2520key%2520insights%252C%2520and%2520conclusions%2520in%2520an%2520accessible%2520way.%2520I<img src="https://sharebuttons.ai/platforms/perplexity-logo.png" width="16" height="16" style="margin-right:6px;" alt="Perplexity">Ask Perplexity https://www.perplexity.ai/search/new?q=Provide%2520a%2520comprehensive%2520summary%2520of%2520this%2520Product%2520Page%2520from%2520Commercial%2520Helical%2520Pile%2520Installation%2520at%2520https%253A%252F%252Fhttps%253A%252F%252Fwww.unitedstructuralsystems.com%252Fcommercial-helical-pile-installation%252Fwww.redsinloomis.com%252Fholiday-dining-loomis.%2520Highlight%2520the%2520main%2520points%252C%2520key%2520insights%252C%2520and%2520conclusions%2520in%2520an%2520accessible%2520way.%2520I<img src="https://sharebuttons.ai/platforms/claude-logo.png" width="16" height="16" style="margin-right:6px;" alt="Claude">Ask Claude https://claude.ai/new?q=Provide%2520a%2520comprehensive%2520summary%2520of%2520this%2520Product%2520Page%2520from%2520Commercial%2520Helical%2520Pile%2520Installation%2520at%2520https%253A%252F%252Fhttps%253A%252F%252Fwww.unitedstructuralsystems.com%252Fcommercial-helical-pile-installation%252Fwww.redsinloomis.com%252Fholiday-dining-loomis.%2520Highlight%2520the%2520main%2520points%252C%2520key%2520insights%252C%2520and%2520conclusions%2520in%2520an%2520accessible%2520way.%2520I<img src="https://sharebuttons.ai/platforms/googleaimode-logo.png" width="16" height="16" style="margin-right:6px;" alt="Google AI">Ask Google AI https://www.google.com/search?udm=50&aep=11&q=Provide%2520a%2520comprehensive%2520summary%2520of%2520this%2520Product%2520Page%2520from%2520Commercial%2520Helical%2520Pile%2520Installation%2520at%2520https%253A%252F%252Fhttps%253A%252F%252Fwww.unitedstructuralsystems.com%252Fcommercial-helical-pile-installation%252Fwww.redsinloomis.com%252Fholiday-dining-loomis.%2520Highlight%2520the%2520main%2520points%252C%2520key%2520insights%252C%2520and%2520conclusions%2520in%2520an%2520accessible%2520way.%2520I<img src="https://sharebuttons.ai/platforms/you-logo.png" width="16" height="16" style="margin-right:6px;" alt="You">Ask You https://you.com/search?q=Provide%2520a%2520comprehensive%2520summary%2520of%2520this%2520Product%2520Page%2520from%2520Commercial%2520Helical%2520Pile%2520Installation%2520at%2520https%253A%252F%252Fhttps%253A%252F%252Fwww.unitedstructuralsystems.com%252Fcommercial-helical-pile-installation%252Fwww.redsinloomis.com%252Fholiday-dining-loomis.%2520Highlight%2520the%2520main%2520points%252C%2520key%2520insights%252C%2520and%2520conclusions%2520in%2520an%2520accessible%2520way.%2520I</div>