Main stages of repair in the home
Main phases of repair works in the apartment.
How to start repair of the apartment?
The very first phase of the repair work of old apartments is the destruction and taking apart first off of the shabby walls and partition walls, removing the wall and ceiling finishing. This stage is one of the most "filthy" stages of the repair.
One more amongst the most important and "dirty" works is the window block replacement. It is essential to do this first off due to the fact that dirt and dust will be unallowable throughout following phases and it is restricted at all to open windows during painting and wallpaper works (big drops of the temperature level and moisture are unallowable). After mounting windows and windowsills it is needed to pack them right away in polyethylene film and to cover windowsills in addition by the fiberboard (in order to prevent scratches).
The following phase is electrical wiring. Wiring can be set up in walls or along the flooring. Electrical wiring is made inside the pipes to ensure electrical security and boost dependability. The pipeline secures electrical wiring from external damages and permits to replace the wire completely without breaking walls and flooring simply by placing the brand-new wire instead of the old one.
House Painting follows the circuitry. The frequent error throughout the synchronised conducting of such works happens when employees forget to lay out one of the cable televisions and home painters have actually currently plastered and ravelled the wall. As a result, extra works are needed to seal goes after on the finished wall. The locations of the feed switch and wall outlet area and their number should be thought-out beforehand. The scheme of power electrical wiring is usually consisted of into the style project.
Later on the system need to be all set to service in case of failures. In addition to the electrical wirings, the telephone cable television and the television cable television are set out. The power cable television should not be laid out near the telephone and antenna cable televisions to avoid noise pickup and disturbance. The most strange minute is laying out the TV cable television. In order to make two (or three) TV sets in the house the 2nd cable television is often merely "strongly soldered" in parallel, so the cable resistance is decreased. As an outcome, the display quality is degraded, many programs can't be gotten and etc. In order to avoid such circumstance it is essential to invite an expert with special devices. He will determine the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.
Painting is the most long-term procedure, that is why it is conducted at the same time in all properties, if it is possible. Hold-ups are related to the innovation. Each applied layer of the plaster (or completing ending up) should dry totally before the work will continue.
Works in sanitary arrangements and the kitchen area start concurrently with house painting. It is much better to fulfill so-called "unclean" operate in the top place and simultaneously. In accordance with the plan of the hygienic service technician place welding, wall chasing and pipeline run are conducted. Steam radiator admissions are prepared, taps and brackets are installed, but radiators are not installed.
Then operates in sanitary arrangements are carried out according to the plan. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The list below phase is putting together ceiling and laying tiles on the floor. And at last other sanitary devices, mixers and accessories are mounted.
After circuitry, installation of rosette plates and terminal boxes the voltage is checked in all point. Ends of wiring are insulated and set out into rosette plates. Sockets and breakers are not set up during this phase in order to save their surface appearance. The finish puttying of walls is conducted simultaneously. The technologically specific control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that determines moisture of the material.
The following stage is the procedure of fill. Fill can be made with different materials-- from usual masonry cement-sand mix to self-aligning floorings. The advantage of the basic mix is its cheapness, the downside is that such mix is much more difficult lined up at the level and the final dry time of such fill is 40 days, just then the next stage of the deal with flooring can be carried out, i.e. the period is too long. Self-leveling self-aligning floors are far more pricey, however more technological. Aligning takes place nearly "automatically" i.e. fluid solution of mix is poured out, then it runs and you receive the horizontal surface. The final dry time is 15 days i.e. you have substantial time economy. The system "warm flooring" is set up into the fill. If the so-called "damp processes" are inapplicable the innovation of the dry aligning (the fill technology) is used bases for floorings with adjustable floor battens are mounted.
After fill door boxes and door are set up. quick fix for a blocked drain https://highline.edu.co.bz/2024/11/21/how-do-plumbers-detect-water-leaks/ Setup of doors must take into the account thickness of future flooring covering. After installation the door can be taken off its hinges and eliminated till completion of repair work or packed into polyethylene movie to protect from damages. Concurrently ceiling can be painted and the tile can be laid in that facilities where it was planned. The tile needs to be laid on the definitely dry overlay.
Finishing of the flooring installing depends on the prepared covering. For the most part (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the flooring by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to supply the close repairing of plywood and long-lasting service of the flooring without squeak and bulging. The plywood provides the extra heat- and acoustic insulation. After mounting of the plywood is completed, wallpaper for painting can be pasted on walls.
In premises where surface covering of the flooring is laminated flooring or parquet hoard, the regular wallpapers are pasted (not for painting) in the first location. Then the floor covering is mounted.
If finish covering of the flooring is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the ordinary wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The mentioned consequence is linked only with such scrambling procedure when the great amount of dust is produced. In spite of the fact that excellent flooring grinders are equipped with the vacuum cleaner, the enough quantity of dust is sped up on surrounding subjects consisting of walls. Dust is very acerbic and is severely cleaned off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not absorb the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.
After this the primary works can be thought about to be ended up. It is left only to set up the plinths, decorative components, breakers and sockets, curtain holders, to hang doors, plant-bands and others.
In conclusion it is needed to note that the sequence of works was noted in general and can change depending upon the certain situation-- the number of spaces in premise, your resources, peculiarities of the building and construction of the multilevel properties. It is based on common sense cloggeed drain vic http://www.bbc.co.uk/search?q=cloggeed drain vic and every person capable of analysis can individually develop such a series.